yep, stage two will start in two weeks. This weekend I had a carpenter and an electrician over, i told them what I want and they will start on 10 december with isolating and finishing the internals of the shed and at the same time install all the electricity.
I will have enough space for appr. 20 cabs and a football table in my gameroom, and maybe a pinball and some console stuff (yes, it's going to be anb allround gaming heaven

) which means that the electricity plan has to be thought through very well. Like André's gameroom, and others, I will have a switchboard to control the power of the cabs by pairs (individually is just too much), ceiling lights per groups, other electrical outlets on the ceiling (for a beamer amongst others) and walls. Yeah, it will be a bit like a control room. I wonder what I will play more, the games or the switchboard.

By the way, the electrician was very enthousiastic about my electrical scheme which I prepared for him, which makes me very much wonder if he is any good!

So yes, it continues, but I don't make any plans yet for the big opening. For all i know, something else comes in between and another delay is there.